2:35 Require photo proof and approval
Sometimes you want proof that a task was completed, or have a manager sign off before it’s marked as done. Ziptask gives every task two switches for that: Require Photo / Document and Requires Approval. They work independently, so you can use either one on its own, or both together — whatever each task needs.
The video shows a landscaping crew, but this works for anything you need to prove got done — a clean, a repair, an install.
Plan: Photo proof and approval are available on Starter and up. Who can do this: owners and admins, and team admins on their own team’s lists, set the switches.
Steps
-
Choose the switches on the task. When you add a task, or tap an existing task and choose Edit, you’ll see the two switches near the bottom of the form. Requires Approval means a manager must approve the task before it counts as complete. Require Photo / Document means the worker must attach a photo or document before the task can be completed. Both are off by default; turn on one, the other, or both. They carry over when you set them on a template’s tasks, so every list made from that template has them.
-
A task that requires a photo or document. When your team taps Mark as done, Ziptask first asks for the file: an Attachment Required window opens. On a phone they can take a photo or choose a file; on the web a file picker opens (photos, PDFs, Word and Excel files). Once the file is attached, Mark as done finishes the task right away — no one else has to get involved — and the photo shows on the task.
-
A task that requires approval. Instead of Mark as done, your team taps Submit for Approval, and the task moves to Pending. Until it’s reviewed it isn’t complete, and they can still Withdraw it if they sent it by mistake.
-
The manager approves or rejects. Everyone who can approve (admins, the owner, and the team admin of the list’s team) gets a notification. Open the task and choose Approve — now it’s done — or Reject, and it goes back to In progress for your team, who are told it needs another look.
-
Both together. With both switches on, the photo comes first: your team can’t submit the task for approval until they’ve attached a photo or document, and you see the attachment when you review it.
Good to know. The photo requirement applies to everyone, including admins. A manager can skip the approval step by marking a task done themselves, but nobody can skip the photo — to finish a task with no photo available, turn the requirement off on that task first.
Now every task that matters ends with the proof you asked for, and, where you want it, your OK — without chasing a single person for it.
What’s next
- Track a project from start to finish — group a job’s phases and watch progress and value as it goes.
- Tasks — the full reference on tasks, approval, and attachments.